The following Technology Plan was revised with the input of Directors, Coordinators, Department Chairs, teachers and parents.

You can download the latest Technology Plan online.

 

West Warwick School Department

Technology Network & Support-System Plan

Original Submission June 1996

First Revision November 1, 2000

Second Revision February 1, 2005

Third Revision July 1, 2006

Fourth Revision July 1, 2007

Fifth Revision July 1, 2008

Latest Revision July 1, 2010

Plan active until July 1, 2011 with yearly budget Amendments

 

Education Technology Planning Team

 

Introduction

 

The West Warwick School Department (WWSD) recognizes that our world is changing rapidly and that technology is a major driving force in change. Computers are everywhere—in banks, shopping malls, hospitals, warehouses, libraries, offices, and airports. Technology today, however, goes beyond computers to include all areas on on-line communications, multimedia, and telecommunications. The possibilities for using technology are seemingly endless.

 

As technology continues to proliferate throughout our world, the subject of technology in schools becomes a critical one. School districts must address several questions as they integrate technology in schools. What are the technology applications that will be integrated into curriculum, instruction, and learning? How can technology applications support the transformation of curriculum, teaching, and assessment? How will technology be used for managing organizational resources? How can technology be used to support communication to and provide services to other community organizations? What kinds of professional development will be required?

 

 

Planning for technology integration in schools is complex. This technology plan should be viewed as a long term, continuous journey and not a destination or a series of unconnected events. This plan is intended to tackle effectively the task of implementing technology into all aspects of the educational process: curriculum, instructing, assessment, and organization and management of schools. Careful planning is crucial to technology integration, and there are no short cuts to comprehensive planning for technology integration.

 

This plan recognizes the necessity of technology integration and is based on three general principles:

 

  1. Information technologies are changing the way people communicate with each other, how and where they work, and how they entertain themselves.

  2. Emerging technologies are central to educating the students to become productive workers, responsible citizens, and life-long learners.

  3. America’s economic strength and ability to compete in the global community are tied to how well schools weave technology into the fabric of education.

 

This plan defines the core of technology functions and components necessary in designing and implementing technology applications in education. It sets a bold direction for the school district as it continues to make improvements in teaching and learning for all students.

Technology Network and Support System

 

A comprehensive technology support system addresses six major functions. Each of these functions includes five core technology components. Technology planning should be integrated into the overall technology network and support system design for the school district. This section of the technology plan describes the core technology functions to be employed by teachers, administrators, students, and other staff.

 

Core Technology Functions

 

  1. Supporting Teaching and Learning: This includes the use of computers and other technologies such as video disks, CD-ROM, multimedia, and distance learning tools for enhancing teaching and learning processes. Recently the WWPS has included the use of Virtual Learning Environments or Collaborative Learning Environments (CLE) to support teaching and learing.

 

  1. Managing Curriculum and Instruction: This includes such instructional support activities as organizing student learning goals, aligning instructional resources and assessments to learner goals, monitoring performance, and preparing various reports.

 

  1. Processing Information: This includes such tasks as word and document processing, document storage and retrieval, and desktop publishing. Document processing is concerned with creating, storing, updating, and disseminating a wide range of written communications in an interactive format using such tools as word processors, forms management, spreadsheets and databases.

 

  1. Supporting Communication: This includes information exchange via voice, video and data using electronic and voice mail, electronic bulletin boards and on-line teleconferencing.

 

  1. Administering and Managing Organizational Resources: This includes such functions as management of information related to students, personnel, finances, organizational and other resources used to support teaching and learning.

 

  1. Managing Learning Resources: This includes computerized cataloging and circulation, acquisitions and information retrieval to support teaching and learning.

 

Core Technology Components

 

The following five components will be addressed throughout the plan.

 

  1. Human Resources: This includes all staff who are assigned responsibilities developing and maintaining hardware, software, or other components of the system, as well as faculty and other staff who use the system.

 

  1. Equipment and Networks: This includes computers, printers, modems, telephone systems, local and wide area networks, distance learning networks, all hardware such as: CD-ROM devices, videotape machines, and satellite dishes.

 

  1. Software and Materials: This includes traditional computer software, as well as compact discs and video disks, videotape, digital video tape and other storage media, including manuals and related supplies and support material for data, voice and graphics.

 

  1. Facilities and Space: This includes offices, workrooms and classrooms equipped with air, lighting and wiring systems.

 

  1. Policies and Procedures: This includes directives, regulations and guidelines for the appropriate use of the technology network and support system.

Levels of Technology to be Addressed

 

In designing the technology network and support system, three levels of technology need to be addressed. First, the outer level includes external pathways to the outside world; school-to-school; school-to-district office; school-to-resources in the community, state, country, and world. Currently at this level are telephones, radios, televisions, and all components of the information highway. A second level deals with technology within each building. At this level a system is needed for both communications and information exchange that links individual users to the external pathways and to information sources within the school. The third, innermost level involves the means that students, teachers, administrators and other staff use to access the system. These include devices such as: computers, printers, scanners, TV monitors, and facsimile machines.

 

Technology Network and Support System (TNSS)

Functions, Goals and Objectives

 

Function 1

Goal

Objectives

Supporting Teaching and Learning

Enhance learning opportunities by providing technology-rich learning environments that support high performance teaching and learning.

  • Support the development of computer skills such as word processing, data analysis, database management, and online communications.

  • Engage in problem solving and structured exploration (“what if” thinking) using modeling, simulation, and visualization tools.

  • Process data and information to create knowledge and support decision making.

  • Engage in systems thinking, making connections, and understanding patterns in order to solve problems.

Function 2

Goal

Objectives

Managing Curriculum and Instruction

Design and deliver a variety of authentic learning opportunities.

  • Document and organize student learning outcomes and student learning opportunities.

  • Organize curriculum resources (i.e., units, lessons, modules).

  • Document learning (i.e., portfolios, performance profiles, performance assessments).

  • Prepare performance reports.

Function 3

Goal

Objectives

Processing Information

Organize and manage the development of information products in a variety of formats

  • Provide integrated software for district-wide use.

  • Manage all forms for all major functions for teaching, learning, management and administration.

  • Organize in-house databases.

  • Utilize Assessment Applications integrating instruction, curriculum and assessment

 

Function 4

Goal

Objectives

Supporting Communication

Facilitate information exchange within the organization and between the organization and external organizations.

  • Provide an internal electronic mail and bulletin board system.

  • Provide voice messages.

  • Provide links to external communication networks.

  • Provide web portal system for internal and external communication

  • Provide a Collaborative Learning Environment (CLE) to facilitate on-line learning opportunities for students, teachers and administrators.

  • Provide management information system that provides all members of the WWPS community access to contextual and assessment data. All of this data will be secure and reached via https protocols.

Function 5

Goal

Objectives

Administering and Managing Organization Resources

Facilitate optimum allocation and management of resources, including time, people, facilities, and space.

  • Provide an automated student scheduling system.

  • Provide an automated performance appraisal process, focusing on electronic portfolios.

  • Automate budget preparation processes linked to strategic planning

  • Automated helpdesk system providing access to all WWPS staff members.

Function 6

Goal

Objectives

Managing Learning Resources

Organize and facilitate access to a comprehensive collection of resources to support teaching, learning, administration and management.

  • Develop an online catalog of learning resource center materials.

  • Develop a circulation control system for learning resources.

  • Provide access to online databases and information resources.

  • Integrate an electronic portfolio system for students across all schools.

 

 

 

Mission Statement:

 

The West Warwick School Department is committed to educating the whole person and to preparing students for effective and visionary leadership in a changing and challenging world. The support system will ensure students, staff and community will have equitable access to and will be able to use technology tools and application to support, facilitate, and enhance their learning and working environment effectively.

 

Vision Statement:

 

We envision the WWSD as a learning community. Classrooms, media centers and offices will be electronically connected and equipped, providing all members of the community with easy and equitable access to information technologies for teaching, learning, management and support.

Supporting Teaching and Learning

Components

Status

Projected Needs

Human resources

  • 1 FT Teacher Specialist/Consultants (Pre5-8) Reduction from 2007-08 School Year

  • 1 FT Assistant Director of Instructional and Information Technology/Network Administrator (PreK-12)

  • 1 FT MIS Coordinator (PreK-12)

  • 1 FT Hardware Help Desk Specialists (PreK-12)

  • 1 FT Director of Instructional and Information Technology

  • 1 FT Hardware Help Desk Specialists (PreK-12)

 

Equipment and Networks

  • Re-engineering of our WAN to include network virtualization allowing for increased access to the Internet. All schools can access the Internet at 50Mbs Internet access.

  • H.323 (Quality of Service) Video Over IP at all schools to every data port

  • LAN Elementary Schools

  • 26 Managed File Servers connected via Windows 2008 (System-wide)

  • File server closets, MDF & IDF (system-wide)

  • Approximately 1200 Desktop Computers System-wide (see inventory)

  • Automated Media Centers WWHS & DMS

  • 26 Station computer labs for general use at DMS & WWHS

  • 20 Station Industrial Technology Lab at DMS & WWHS

  • 10 Station Art Lab at WWHS

  • 65 Classrooms with 4:1 Student to computer ratio (27”) computer monitor w/TV converter (PreK-5)

  • 2-26 Station Business Computer Lab for electronic portfolios at WWHS

  • System-wide Web Portal

  • 2-10 station wireless computer carts at WWHS/DMS

  • 2-26 station wireless computer cart at WWHS.

  • 27” computer projection in all classrooms at Wakefield Hills Elementary School

  • 3 wireless computer carts housing 15 computers at Horgan School

  • 4-20 station wireless, laptop computer lab at DMS

  • Interactive Whiteboard Technology at DMS for all mathematics classrooms (12 in total)

  • 26 station wireless, laptop computer lab at WWHS

  • Replace computer labs at each elementary school

  • Increase number of student stations in each classroom from 1 to 5

  • Automate media centers at elementary schools

  • 2-20 station wireless, laptop computer lab at DMS

  • Interactive Wireless Slate Whiteboard Technology at all schools (6-10 classrooms at each school)

  • LCD projector/document camera (6-10 classrooms at each school)

  • Implement managed wireless network infrastructure at Horgan and Wakefield Hills Elementary Schools

  • Maintain Internet bandwidth at 50mb for 2012-13 School Year

  • Replace network file servers as necessary using network file server replacement schedule

  • Implement wireless tablets for formative and summative assessments (using iPad or the like)

    Managed Network Services with OSHEAN

Software and materials

  • See inventory

  • RM Easiteach/Framework Mathematics Framework at DMS and WWHS to provide additional mathematics instruction to wide variety of ability levels.

  • As needed based on curriculum development based on the WWSD’s focus on Standards

Facilities and space

  • Recent electrical upgrades to all file server closets

  • 2 data drops per elementary school classroom connected to 100 mbs switch

  • 6 data drops per middle school and high school classroom connected to 100 mbs switch

  • Evaluate individual furniture needs in each classroom

  • Increase number of data drops per classroom at Horgan and Greenbush Schools

  • Upgrade electrical capacity as data drops are increased

  • Implement managed wireless network infrastructure at Horgan and Wakefield Hills Elementary Schools

Policies and Procedures

  • Staff AUP Updated and Revised September 2007

  • Student AUP

  • Updated CIPA/WWHS Internet Filtering Policy

  • Internet Search Guidelines

  • World Wide Web Publishing Guidelines

  • On-line WWSD Policy Manual

  • Computer Software Standards for all levels

  • Personal Laptop Policy

  • Software Installation Process

  • HelpDesk(IT) Process

  • Wireless Access Point Policy

  • Proficiency Based Graduation Requirements and use of RI Electronic Portfolio System (RIEPS)

  • Review and Revise all existing policies and technical guidelines

 

Managing Curriculum and Instruction

Components

Status

Projected Needs

Human resources

  • Director of Elementary Education

  • Director of Professional Development Academy

  • Director of Special Education

  • Director of Property Services

  • Director of Network Infrastructure

  • Director of Instructional and Information Technology

  • Director of Personnel

  • Continued cooperation between directors concerning technology implementation

Equipment and Networks

  • LAN & WAN

  • 26 Network File servers

  • Continued upgrade in network infrastructure and LAN OS

Software and materials

  • See inventory

  • Relational database of instructional resources and standards based instruction

Facilities and space

  • 10 Harris Avenue

  • 10 Harris Avenue

Policies and Procedures

  • System-wide standards concerning data collection

  • Continued interoperability between various departments

 

Processing Information

Components

Status

Projected Needs

Human resources

  • Coordinator of Management Information System

  • Special Duties Clerk

  • Secretaries at each school

  • None projected

Equipment and Networks

  • Networked file servers connected via WAN

  • Migrated all 10 Mbs hubs to 100 Mbs switches

  •  

Software and materials

  • Implementation of Google Apps including Email, Docs/Drive

  • Office Professional Suite for office staff

  • Implementation of Aspen for integrated management information system.

  • Implement Open Office across district

  • Continued usage of Online Meeting Space for training purposes

  • Provide access to student management information to parents/legal guardians via the WWW – Aspen Parent Portal

Facilities and space

  • Adequate

  • Continue to upgrade Wireless LAN infrastructure

Policies and Procedures

  • Open Office

  • Continued development of system-wide standards concerning data processing, retention, and use

 

Supporting Communication

Components

Status

Projected Needs

Human resources

  • 1FT Teacher Specialist/Consultants (PreK-5)

  • 1 FT Network Administrator (PreK-12)

  • 1 FT MIS Coordinator (PreK-12)

  • 1 FT Hardware Help Desk Specialists (PreK-12)

  • 1 FT Director of Instructional & Information Technology Department

  • 1 FT Teacher Specialist/Consultant

  • 1 FT Hardware HelpDesk Specialist (PreK-12)

Equipment and Networks

  • LAN in each building

  • WAN System-wide for Intranet and Internet Access

  • Analog Video System DMS & WWHS

  • Internal Phone System DMS, WWHS, Wakefield Hills & Greenbush

  • H.323 Quality of Service Video for Distance Learning at all schools and Administration Building

  • 6 data drops per classroom at DMS, WWHS, Wakefield Hills & Quinn Schools

  • 2 data drops per classroom at each Horgan and Greenbush Elementary schools

  • 6 data drops per classroom in 1/2 classes at Horgan & Greenbush

  • VOIP for Administration Building

 

  • Upgrade switches at Horgan and Quinn Elementary schools

  • Additional data drops in Horgan and Greenbush classrooms

  • Additional wireless infrastructure at Horgan and WHES

Software and materials

  • Access to WWPS Google Apps email system via the Internet

  • System-wide standards based on Google Chrome

  • Implementation of Aspen at WWHS and DMS

  • Provide teachers, students and parents continued training regarding Aspen using online training tool

  • Provide access to student management information to parents/legal guardians via the WWW

  • Provide teachers, students and parents continued training regarding Aspen using online training tool

Facilities and space

  • Adequate at this time

  • Adequate at this time

Policies and Procedures

  • System-wide standards for email and Internet browsing

  • Continued development of system-wide standards

 

Administering and Managing Organizational Resources

Components

Status

Projected Needs

Human resources

  • 1 FT Network Administrator (PreK-12)

  • 1 FT MIS Coordinator (PreK-12)

  • 1 FT Technicians (PreK-12)

  • 1 FT Director of Instructional and Information Technology Department

  • 1 FT HelpDesk Technician

Equipment and Networks

  • H.323 voice over IP telephony

  • WAN System-wide for Intranet and Internet Access

  • AS 400 System for financial package

  • H.320 Quality of Service Video at administration location

  •  

Software and materials

  • Use of Aspen Management Information System for staff, student, personnel data

  • District-wide standard of Microsoft Professional Office Suite

 

Facilities and space

  • Adequate at this time

  • Adequate at this time

Policies and Procedures

  • System-wide standard of Microsoft Professional Office Suite

  • Take home policy for equipment

  • Continued development and revision of policies

 

Managing Learning Resources

Components

Status

Projected Needs

Human resources

  • .2 FT Library Media Specialist Coordinator (PreK-12)

  • 6 FT Library Media Specialists (PreK-12)

  • 2 FT Library Clerks (6-12)

  • 1 FT Library Clerk to assist with elementary school library automation project

Equipment and Networks

  • See inventory

  • Continuation of system-wide library automation

Software and materials

  • See inventory

  • Continue to purchase upgrades to library automation projects

Facilities and space

  • Adequate at this time

  • Adequate at this time

Policies and Procedures

  • No formal system wide plan regarding technology issues

  • A formal system-wide plan needs to be developed

Recommendations

 

The following recommendations are a consensus of the Technology Committee. It is the goal and recommendation of this committee to provide adequate, updated and regularly maintained technology for the entire learning community.

 

Human Resources

 

The West Warwick School Department is committed to the realization that human resources are the most important components of the implementation of a successful technology plan. In view of this we purpose the following recommendations.

 

  • Provide one additional HelpDesk Technician

  • Provide on-site technology specialists to train, troubleshoot, and facilitate technology infusion at each facility.

 

Equipment and Networks

 

The West Warwick School Department is committed to providing state of the art technology and tools within the learning environment and community.

 

  • Re-engineer WWPS WAN to network virtualization improving network performance for all schools to access the Internet.

  • Provide necessary student/teacher work stations as described in projected needs

  • Provide network infrastructure upgrades as described in projected needs

  • Provide automated media center at each school

  • Provide appropriate furniture to suit equipment needs

  • Provide network centrally managed wireless infrastructure at Horgan and Wakefield Hills Elementary School

  • Provide network centrally managed wireless infrastructure at all other schools

Software and Materials

 

The West Warwick School Department is committed to providing appropriate software and materials to ensure the infusion of technology as an integrated part of the curriculum and the administrative operations.

 

  • Provide the necessary software to integrate technology into curriculum and administration operations.

  • Purchase of RM Easiteach at all schools.

  • Continue to implement RIEPS at WWHS and DMS as well as using the system to support adults within the district in an online learning environment.

 

Facilities and Space

 

The West Warwick School Department is committed to providing appropriate space and facilities and recommend modifications based on current and projected needs.

 

 

  • Provide for the continued evaluation of existing facilities and recommend modification based on current and projected needs.

 

Policies and Procedures

 

The West Warwick School Department is committed to developing consistent and standardized policies for the use of technology.

 

  • Provide continued opportunity through the Professional Development Academy (PDA) for differentiated levels of training, adequate time frames, and consistent commitment to on-going training.

  • Provide continued discussion for the decision making process regarding technology.

  • Provide a continued format for the review and re-evaluation of the approved Technology Plan.

  • Provide a policy concerning Internet filtering in the WWSD

  • Provide guidance concerning grant writing and fund raising procedures

 

Technology Implementation Phases

See attached Budget & Budget Justification Documents for Phases IX-XI

1997-Present

 

Phase I – 1997-98

Phase II – 1998-99

Phase III – 1999-2000

  • Begin LAN infrastructure at elementary schools

  • Provide staff development via PDA

  • Begin to establish policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

  • Continue system-wide infrastructure

  • Provide staff development via PDA

  • Continue developing policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

  • Plan automation of Media Centers

  • Continue system-wide infrastructure

  • Provide staff development via PDA

  • Begin planning of WAN

  • Continue developing policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

  • Begin automation of Media Centers

Phase IV – 2000-01

Phase V – 2001-02

Phase VI – 2002-03

  • Continue system-wide infrastructure

  • Provide staff development via PDA

  • Implement system-wide WAN

  • Continue developing policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

  • Complete automation of Media Centers

  • Add full-time Standards Implementation Coach

  • Continue system-wide infrastructure

  • Provide staff development via PDA

  • Continue developing policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

  • Continue system-wide infrastructure

  • Provide staff development via PDA

  • Continue developing policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

Phase VII – 2003-04

Phase VIII – 2004-05

Phase IX – 2005-06

  • Continue system-wide infrastructure

  • Provide staff development via PDA

  • Continue developing policies and procedures

  • Continue software acquisition

  • Continue hardware acquisition

  • Continue system-wide infrastructure development for H.323 ATM topology.

  • Replace Horgan router with H.323 ATM router Cisco 2621

  • Provide staff development via PDA regarding integrating technology into a standards-based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, mClass and other assessment tools

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • Automate all media centers

  • LCD Projection Units with computer cart system

  • Continue School Center contract

  • Continue to upgrade Internet access speeds from 3Mbs to 5Mbs

  • DMS & WWHS Computer replacement

  • Wireless Computer Carts @ WWHS & DMS

  • Software Program for DMS & WWHS Music Programs

  • Printer replacement of ink jet with laser network printers

  • Continue wiring projects at elementary schools to increase data ports at Horgan school from 2 ports to 8 ports in each classroom

  • Maintain system-wide infrastructure development for H.323 ATM topology

  • Provide staff development via PDA regarding integrating technology into a standards based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, mClass and other assessment tools

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • LCD Projection Units with computer cart system

  • Continue School Center contract

  • Continue to maintain Internet access speeds from 7Mbs to 10Mbs

  • Wireless laptop technology at all elementary schools

  • Replacement of computer labs at all elementary schools

  • Replace Information Technology labs at DMS

  • Continue wiring projects at Greenbush elementary school to increase data ports in each classroom from 2 ports to 8 ports

  • Continue to upgrade routers, switches and network infrastructure at Horgan and Quinn Elementary Schools.

Phase X – 2006-07

Phase XI – 2007-08

Phase XII – 2008-09

  • Maintain system-wide infrastructure development for H.323 ATM topology

  • Provide staff development via PDA regarding integrating technology into a standards based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, RIEPS/electronic portfolio and other assessment tools

  • Continue Collaborative Learning Environment (CLE) for online course development

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • LCD Projection Units with computer cart system

  • Continue School Center contract

  • Continue to upgrade Internet access speeds as necessary

  • Replacement of computer labs at DMS & WWHS schools

  • Continue to maintain Internet access speeds at 10Mbs of service

 

  • Continue system-wide infrastructure development for H.323 ATM topology.

  • Replace Horgan router with H.323 ATM router Cisco 2621

  • Provide staff development via PDA regarding integrating technology into a standards-based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, RIEPS/electronic portfolio and other assessment tools

  • Continue Collaborative Learning Environment (CLE) for online course development

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • Continue automation project all media centers

  • Additional LCD Projection Units with computer cart system for each school

  • Continue School Center contract

  • DMS & WWHS Computer replacement

  • Wireless Computer Carts @ WWHS & DMS

  • Software Program for DMS & WWHS Music Programs

  • Follow Laserjet replacement schedule for all schools

  • Continue wiring projects at elementary schools to increase data ports at Horgan school from 2 ports to 8 ports in each classroom

  • Continue to maintain Internet access speeds at 10Mbs of service

  • Continue purchase of wireless phone lines for property services department and members of central office

  • Re-engineer system-wide infrastructure to network virtualization for H.323 and improved data services to the Internet..

  • Follow district-wide server replacement schedule

  • Provide staff development via PDA regarding integrating technology into a standards-based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, RIEPS/electronic portfolio and other assessment tools

  • Continue Collaborative Learning Environment (CLE) for online course development

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • Continue automation project all media centers

  • Additional LCD Projection Units with computer cart system for each school

  • Continue School Center contract

  • DMS & WWHS Computer replacement

  • Wireless Computer Carts @ WWHS & DMS

  • Interactive Whiteboard Technologies at DMS and WWHS

  • Software Program for DMS & WWHS Music Programs

  • Follow Laserjet replacement schedule for all schools

  • Continue wiring projects at elementary schools to increase data ports at Horgan school from 2 ports to 8 ports in each classroom

  • Continue Internet access speeds of 12Mbs of service

  • Continue purchase of wireless phone lines for property services department and members of central office

Phase XIII –2009-10

Phase XIV – 2010-11

Phase XV – 2011-12

  • Re-engineer system-wide infrastructure to network virtualization for H.323 and improved data services to the Internet..

  • Follow district-wide server replacement schedule

  • Provide staff development via PDA regarding integrating technology into a standards-based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, RIEPS/electronic portfolio and other assessment tools

  • Continue Collaborative Learning Environment (CLE) for online course development

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • Continue automation project all media centers

  • Additional LCD Projection Units with computer cart system for each school

  • Continue School Center contract

  • DMS & WWHS Computer replacement

  • Wireless Computer Carts @ WWHS & DMS

  • Interactive Whiteboard Technologies at DMS and WWHS

  • Software Program for DMS & WWHS Music Programs

  • Follow Laserjet replacement schedule for all schools

  • Continue wiring projects at elementary schools to increase data ports at Horgan school from 2 ports to 8 ports in each classroom

  • Continue Internet access speeds of 12Mbs of service

  • Continue purchase of wireless phone lines for property services department and members of central office

  • Continue to re-engineer system-wide infrastructure to take advantage of network virtualization for H.323 and improved data services to the Internet..

  • Follow district-wide server replacement schedule

  • Provide staff development via PDA regarding integrating technology into a standards-based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, RIEPS/electronic portfolio and other assessment tools

  • Continue Collaborative Learning Environment (CLE) for online course development

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • Continue automation project all media centers

  • Additional LCD Projection Units with computer cart system for each school

  • Continue School Center contract

  • DMS & WWHS Computer replacement

  • Wireless Computer Carts @ WWHS & DMS

  • Interactive Whiteboard Technologies at DMS and WWHS

  • Software Program for DMS & WWHS Music Programs

  • Follow Laserjet replacement schedule for all schools

  • Continue wiring projects at elementary schools to increase data ports at Horgan school from 2 ports to 8 ports in each classroom

  • Continue Internet access speeds of 24MBs of service

  • Continue purchase of wireless phone lines for property services department and members of central office

  • Creation of professional training room centrally located at the Administration Building with 27 laptops, interactive whiteboard, wireless tablet, document camera, H.323 video technology

    Managed Network Services with RINET

  • Continue to re-engineer system-wide infrastructure to take advantage of network virtualization for H.323 and improved data services to the Internet..

  • Follow district-wide server replacement schedule

  • Provide staff development via PDA regarding integrating technology into a standards-based classroom

  • Continue developing policies and procedures for Instructional & Information Technologies

  • Continue software acquisition regarding Office Suite, RIEPS/electronic portfolio and other assessment tools

  • Continue Collaborative Learning Environment (CLE) for online course development

  • Continue hardware acquisition to increase number of student stations in each classroom to a 4:1 ratio using LCI and/or MCI model

  • Continue automation project all media centers

  • Additional LCD Projection Units with computer cart system for each school

  • Continue School Center contract

  • District-wide Computer replacement

  • Wireless Computer Carts @ all schools

  • Interactive Whiteboard Technologies at all schools

  • Software Program for DMS & WWHS Music Programs

  • Follow Laserjet replacement schedule for all schools

  • Continue wiring projects at elementary schools to increase data ports at Horgan school from 2 ports to 8 ports in each

  • Continue Internet access speeds of 24MBs of service

  • Continue purchase of wireless phone lines for property services department and members of central office

  • Implement centrally managed wireless network infrastructure across the district

  • Continued support of PD training room

    Managed Network Services with RINET

Planning Professional Development for Educational Technology:

Creating a Technology-Rich Learning Community

Introduction

 

The West Warwick School Department is committed to incorporating technology into all of the school system’s educational, administrative, and management functions. This infusion of technology will present an opportunity to enrich faculty and staff learning opportunities. The WWSD will provide time for faculty and staff to take part in education and training activities on an on-going basis.

 

The WWSD subscribes to the philosophy of the RIF-SMART mission that the best trainers of teachers are other teachers. The teachers and staff realize that the acquisition of technology will be but the first step toward our goal of student-centered learning, and are committed to continued staff development. The West Warwick School Department recognizes the need for continued staff development and has committed to, on an annual basis; at least 18 hours paid training per teacher for professional development.

 

This professional development plan is based on an assessment of faculty and staff needs and is guided by:

 

  • a shared vision of our district as a provider of challenging learning opportunities;

  • a set of principles and understandings regarding professional development;

  • a set of core and enriched technology competencies for all faculty and staff.

 

The plan consists of three interrelated elements – education, training and support.

Guiding Principles

 

Professional development for technology must respect our district’s traditions while enhancing the development of its learning community. The WWSD recognizes the expertise of its own staff and will use the “teachers training teachers” model in its Professional Development Academy. Based on staff interviews and surveys the following findings are:

 

  • Many members of the faculty use computers to be more productive personally and professionally.

  • Many teachers use computers in their teaching.

  • Most faculty want to use more technology in their teaching.

  • All faculty members have received on-going technology training through the PDA

 

Our district’s vision statement for technology also provides guidance for the professional development design. Key elements from the vision are:

 

  • Continue to grow as a learning community.

  • Provide technology-rich learning opportunities.

  • Develop individual learning plans.

  • Provide multiple learning opportunities.

  • Integrate technology into curriculum and instruction.

 

Professional development guidelines should:

 

  • Provide a balance of education, training and support services.

  • Integrate professional development into day-to-day learning and work.

  • Link professional development to the goals of the district.

  • Develop a support system for professional development to assure long-term growth.

  • Focus the assessment of professional development on its contribution to the quality of student learning opportunities.

  • Integrate education, training and support for technology with classroom instruction and administrative needs.

  • Employ classroom and workplace support and coaching so that technology and content can be linked.

  • Provide choices for individual professional development that accommodate different learning styles and preferences.

 

Technology Competencies

 

The use of technology is essential for successful lifelong learning and work in a technological and information-rich society. To prepare its graduates for this society, all of our district’s faculty and staff must be technology literate. Some core competencies expected of faculty and staff are found in the following chart.

 

Core Competencies

Advanced Competencies

  • Integrate technology into student learning environments and learning opportunities.

  • Prepare a variety of written communications using word processors.

  • Use electronic mail and other tools to support collaborative learning and work.

  • Access data and information from local and remote databases.

  • Use system-wide communications systems.

  • Use information systems and information following district procedures and policies.

  • Use district administrative applications and accomplish administrative and management tasks as required.

  • Prepare messages with words, images and sounds using drawing, painting, and interactive and hypermedia tools.

  • Engage in problems solving and structured exploration using modeling, simulation, spreadsheet, and visualization tools.

  • Gather and interpret data using computer-based sensors.

  • Process data and information to created knowledge and support data-driven decision making.

 

These competencies relate to the six functions that comprise our district’s Technology Network and Support System (TNSS): supporting teaching and learning, managing curriculum and instruction, processing information, supporting communication, administering and managing organizational resources, and managing learning resources.

 

Program Components

Structure

 

The professional development program structure has three components: education, training and support. The education component will be devoted to building a shared foundation of knowledge and understanding about the uses of technology. The education component will help faculty and staff to form individual and collective images of the ways that computers and related tools can enhance teaching and learning. This component will include such activities as readings, discussions, visits to exemplary programs, and videotapes, presentations by the faculty and staff of their work, and exploring the district’s facilities.

 

The training component will be devoted to developing skills in the use of various technology tools and in applying these tools in a wide variety of teaching, learning, and administrative environments. Special attention will be given to modeling the effective use of technology. The training component will include such activities as workshops in the district or away, seminars, hands-on practice addressing specific competencies, such as use of the Internet, and self-study using software.

 

The support component will include a variety of assistance activities to provide ongoing help to faculty and staff as they apply their new knowledge and skills. This will include such activities as in-class demonstrations, and modeling, coaching, peer feedback, active research, peer tutoring, informal exchanges, and access to help from various support services.

 

Content

 

The competencies may be acquired in many ways. They may be incorporated into a range of courses that allow for individual choice. The content sequences in each area should progress from basic to advanced topics and applications. Other faculty and staff may choose to acquire competencies in various formats.

 

Experiences indicates that, as teachers progress in their training, they will need additional support to help them apply their new knowledge and skill in their classroom lessons and teaching practices. For example, following training in the use of the Internet, teachers may have sufficient knowledge and skill to demonstrate an online search for their students, but may not be ready to go beyond simple replication of what they learned. At this time the support component becomes important supplying informal collegial help. With this resources teachers and staff will be able to develop their skills in ways not addressed during the training.

 

It is essential that our district provide time for faculty and staff to take part in education and training activities. Our district’s program for professional development in the area of technology will be flexible, responding to changing technologies and academic and administrative needs as expressed by individuals.

 

Assessment

 

Assessment of the professional development program should address these variables:

 

  • Changes in participants’ knowledge

  • Changes in participants’ skill level and use

  • Changes in participants’ opinions and feelings

  • Changes in quality of student learning opportunities

  • Changes in student performance

 

Implementation Considerations

 

The following considerations are very important for the implementation of the professional development program.

 

Staging and Phasing:

Training and support need to be provided “just in time,” that is, just before and during the period when the teachers will have an opportunity to apply the new learning to their work. The education component can be scheduled at any time.

 

Scheduling:

Professional development opportunities need to be scheduled at different times (of the day, week, school year, and vacation periods) in order to accommodate the diverse faculty and staff schedules and responsibilities. Training opportunities need to include both synchronous and asynchronous opportunities for teachers, administrators, students and parents.

 

Networks:

Linking faculty and staff who have common learning agendas can promote peer exchange. These networks should include informal support exchanges as well as the use of collaborative learning tools.

 

Time:

Faculty and staff need time for learning. The West Warwick School Department employs a range of methods for sufficient time for education and training.

 

Potential Funding Sources

 

Implementation of the Technology Plan will require resourcefulness in the acquisition of a variety of funding sources. An in depth investigation of the funding solutions, public support, promotional efforts, and on going financial planning will be required for a successful implementation and continued support of technology.

 

The Educational Technology Planning Team submits the following funding options for consideration.

 

School Reform/Restructuring Grants:

The effective use of technology in the curriculum is a requirement in these grants. Schools that receive the grants may use restructuring dollars to powerfully impact the curriculum program and student learning program via the use of technology tools.

 

Endowments:

Parent groups such as PTA’s along with the public sector could form partnerships to create Endowment Programs. The interest from these dollars raised to achieve school goals could then be used for the required technology needed for plan implementation.

 

Grants and Foundations:

Given the difficult economic conditions in the community, grants and foundations must be explored as ways to achieve district technology goals. Fortunately, the WWSD has been very successful in securing funding for educational technology. Technology grant writing teams have been created in each building and have been successful in securing funding for classroom technology.

 

Reallocation of System Funds:

The re-evaluation of curriculum design and implementation in the schools to include technology as part of the instructional program for all students will result in the redistribution of curriculum funds. Dollars previously targeted for textbooks, traditional teaching supplies, staff development, will be re-examined and, if appropriate, redirected toward system technology goals. This will include the use of technology tools to improve curriculum, deliver effective software programs to support existing instructional programs, and technology tools to improve teacher efficiency in the classroom.

 

Technology Partnerships:

Potential partnerships between the school district and public and private sectors should be examined. These partnerships will include work-study programs, equipment on loan, and donations. In addition, these partnerships can serve as links to other joint partnership grants. The WWSD has already taken advantage of several partnerships with Tech Corps RI, APC, RINET, RITTI and NASA to obtain technology in the classroom.

 

Categorical Funds:

These funds (Chapter I, II) could be used to purchase hardware, software, and staff development to support technology-based instructional projects. The WWSD has already taken advantage of Title funding whenever possible and appropriate.

 

Home and School Organizations:

Home and school organizations can coordinate fund-raising activities to meet the identified needs of a school, such as acquiring technology equipment. Each of the individual school PTA or PTO organizations purchased several technology components for each school. Various PTA groups bought technology items such as digital cameras, scanners, RAM chips, CD burners and software for each of their schools.

 

Partnerships with Colleges or Local Adult Education Programs:

A local college or adult education program can team with a district school to fund the purchase of hardware, software or staff development on the school campus. The WWSD has taken advantage of college partnerships with programs such as RITTI.

 

Vendor Contributions:

Technology vendors will sometimes donate hardware, software, or instructional materials to a school system. The WWSD has benefited greatly from the generosity of vendors such as APC, Synet and RINET.

 

Community Workshops:

Community workshops and programs offered through the schools can generate revenues earmarked for technology.

 

Lease Purchase and Financing Agreements:

Lease purchase and financing agreements are other ways to stretch system dollars. Under such agreements, the system may finance equipment and software. The benefits of financing include spreading the costs of software and service, along with the hardware, into multiple budget years, providing fixed monthly payments with non-appropriation provisions, and guarding against technical obsolescence of the hardware.

 

Local Business Donations:

Business has much to offer schools including expertise, training programs, equipment and software.

 

Summary

 

The West Warwick School Department recognizes that the implementation of technology is a process that requires an ongoing philosophical and financial commitment. The WWSD has clearly made that commitment since the inception of its first Technology Plan in 1996. The impact of technology on the educational community is crucial to developing knowledgeable citizens able to compete in our global society. The Technology Committee recognizes the West Warwick School Department has taken the necessary steps in tackling many of the issues raised in the introduction of this plan:

 

  • What are the technology applications that will be integrated into curriculum, instructions and learning?

  • How can technology applications continue to support the transformation of curriculum, teaching and assessment?

  • How can technology continue to be used for managing organizational resources?

  • How can we continue to use technology to support communication to the outside community.

  • What kinds of professional development opportunities do we need to provide now that most staff members have been introduced into using technology for their own production.

 

The Educational Technology Planning Team believes through the concerted efforts of the West Warwick community the goals of this plan can be realized. Our endeavor can have a dynamic impact on how we meet the individual needs of the entire West Warwick learning community.

 

Individual school technology plans have been created and are aligned with the general principals of this document. Please note that each school’s individual plan has been attached to this document for referencing purposes.


Proposed Budget based on LEA, and Grant Dollars- Priorities will be supported based on available funding

PrioritySeriesDescriptionLocationQty.Unit PriceExt. Price
LEAMaintenance ContractsContract for Antivirus Software, School Center, Aspen Management Information System, RIEPSDistrict-wide1$84,000.00$84,000.00
LEAPrintingPrinting ServicesDistrict-wide1$6,000.00$6,000.00
LEAComputer RepairsTechnology RepairsDistrict-wide1$13,000.00$13,000.00
LEAReport Cards PrintingReport Cards & SchedulesDistrict-wide1$5,000.00$5,000.00
LEAComputer SoftwareComputer Software District WideDistrict-wide1$13,000.00$13,000.00
LEAIT Departement HRHR Costs for IT Dept. basic office suppliesDistrict-wide1$490,000.00$490,000.00
LEAInternet ServicesInternet Services Priority I ServicesDistrict-wide1$42,000.00$42,000.00
LEAInternet ServicesInternet Services Priority I Services Managed Network ServicesDistrict-wide1$17,000.00$17,000.00
LEAWireless Phone ServicesWireless Phone Services Priority I ServicesDistrict-wide1$5,000.00$5,000.00
LEALocal Phone ServicesLocal & Long Distance Phone Services Priority I ServicesDistrict-wide1$22,000.00$22,000.00
1HardwareNetwork Infrastructure Upgrades Switches, Patch Panels, Wiring Priority II ServicesDistrict-wide1$25,000.00$25,000.00
1HardwareWireless Infrastructure UpgradesDistrict-wide1$100,000.00$100,000.00
1HardwareServer Replacement ScheduleDistrict-wide5$4,000.00$20,000.00
1EquipmentPresentation Set-ups including laptop, cart, LCD projector and wireless interactive slatesDistrict-wide30$3,200.00$96,000.00
1HardwarePurchase 180 Computers w/ 19” monitors for classrooms across the district to increase 4:1 computer to student ratioDistrict-wide180$350.00$63,000.00
1HardwareGray Scale Laser Printer Replacement ScheduleDistrict-wide25$2,500.00$62,500.00
1SoftwarePurchase additional site license agreements for content area classrooms in music and CADDWWHS1$5,000.00$5,000.00
1HardwarePurchase 40 laptop computers with wireless technology for a movable labDMS40$365.00$14,600.00





Total$1,083,100.00
LEA Items have already been included in Local Budget Items, Priority Numbered Items will be addressed as additonal funds become available through LEA, State, Federal or Private Funding.